Lesson 08 · Operational · 13 min
Taking one to production
Six industries, six shapes, six different constraint sets — and a short list of questions that applied to all of them. This is that list.
- What must never happen? Write it as a check, not as a sentence in a prompt.
- What must happen first? Enforce it in the tool or the graph, where it cannot be talked around.
- Who is accountable? Put a person in front of any action that carries their accountability.
- What would someone need to see to understand a decision? Record that, not just the output.
- What does one resolution cost, and what is it replacing?
- How would you know it had got worse? That is an eval, and it needs to exist before launch, not after the first incident.
Everything meets here. Evals gives you a way to know whether a change helped. Agent loops gives you something that stops sensibly and refuses what it should. Loop engineering wraps a checker round it; harness engineering names the guides and sensors that govern it. Graphs give structure to the parts that must not vary, patterns tell you which shape fixes which failure, and retrieval supplies the facts. Industry decides which of those constraints are yours to choose and which are handed to you.
The most valuable habit across all six blueprints was the smallest: run the thing and read the trace. Every genuine finding in this course — the missed emergency, the loop that repeated itself, the unreachable graph node — came from running it and looking, not from reasoning about what should happen.
Start with the check for the worst outcome. In each blueprint here, the highest-severity failure had exactly one check standing between it and a plausible-looking answer. Write that one first.
Checkpoint
Run all six blueprints and write down the highest-severity check for each.